Details: schedule - i docking / undocking, hull, deck preparation, utg, steel plate renewal and anode renewal docking and undocking : docking and un-docking in a safe manner with normal docking arrangement, (includes providing and arrangements of chocks, positioning the vessel, engaging divers, cranes, labourers & providing necessary tools, boat, and all other materials required etc. for safe docking and undocking) on the slipway. chpa will provide only a slot for a slip-way. dock / undock on slipway hull cleaning: upto water line (1.7 m) - total 147 sq.m approx. above water line ( 1.3m)- total - 71.6 sq.m approx. sea growth scrapping and cleaning work. sand blasting work. high-pressure fresh water washing as per instruction p
Sector: Harbor