Details: take delivery of structural steel supplied by tnpl free of cost, remove bends if any,fabricate as built up column, beam, roof truss & roof monitor, purlin, etc., and in position with mobile crane or derrick at all levels, including cost of all consumables like gas, standard welding rods, bolts & nuts, tools & tackles, scaffolding,etc., complete. (as per drawing) dismantling of existing ms structure, platform, roof truss, etc., without damage and hand over to tnpl stores/department for reuse including consumables, transportation, etc., complete at all levels. take delivery of 150mm dia ms pipe, fabricate and in position as rain water down take pipe including fabrication of necessary swan necks, bends, shoes etc., complete including cost of necessary clamps, tw blocks, bolts, nuts and one coat of red oxide primer etc., complete at all levels. dismantling of existing roof and cladding sheet (galvalume / ac sheet) without damage and hand over to tnpl stores/department for reuse includi
Sector: Industries and Factories