Details: charges for rubber lining of 600 nb,450 nb,300 nb & 200 nb pipe and fittings including the area with 3 mm thick neoprene rubber including the cost of sand blasting, steam curing and cost of consumables such as primer sand etc. charges for transporting of 1 no pipe/fittings from working area to the rubber lining area and return back to working area.
Sector: Power Sector