Details: sh : rcc slab culvert 2.00 mtr span. excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and utilised the remaining earth locally for road work.) ordinary soil manual means upto 3 m depth ordinary rock ( not requiring blasting) manual means upto 3 m depth pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications pcc grade m15 height upto 5m furnishing and placing reinforced/prestressed cement concrete in super-structure as per drawing and technical spe
Sector: PWD