Details: excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approvaed material.)iv) hard rock (blasting prohibited), a) mechanical means, (without dewatering) pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix infoundation with crushed stone aggregate 40 mm nominal size mechanicallymixed, placed in foundation and compacted by vibration including curing for14 days.) plain/reinforced cement concrete in open foundation complete as perdrawing and technical specifications e) rcc grade m25case i using concrete mixer supplying, fitting and placing un-coated hysd bar reinforcement infoundation complete as per drawing and technical specifications providing and laying of rcc work in substructure like abutment, abutment cap, pier cap, dirt wall, return wall , scre
Sector: PWD