The PWD Arunachal Pradesh has published a tender for "Construction of Boundary Wall around Boys Hostel at GHSS Pangin, Siang District." on the 20 Mar 2026. This tender belongs to Hostel Construction category. This tender is published in East Siang, Arunachal Pradesh location. The vendors interested in this tender and related Hostel Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: residential building Tenders | all civil works Tenders | residential building construction Tenders
Related categories: Apartment Construction Tenders | Cooperative Construction Tenders | Hostel Construction Tenders |
PWD Arunachal Pradesh issued 7 tenders for Hostel Construction last year
With, 0 floated just last month.
| Tender Title | Construction of Boundary Wall around Boys Hostel at GHSS Pangin, Siang District. |
|---|---|
| Tender Description | sh: compound wall earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). reinforcement cement concrete work in |
| Comments | sh: compound wall earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size). reinforcement cement concrete work in |
| Published Date | |
|---|---|
| Due Date | 25 Mar 2026 00:00:00 |
| Estimated Value | 1.43 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |