The Arunachal Pradesh Police has published a tender for "Establishment of New Fire Station at Mebo,East Siang District. (Re-Tender)" on the 06 Mar 2026. This tender belongs to Fire Station Construction category. This tender is published in East Siang, Arunachal Pradesh location. The vendors interested in this tender and related Fire Station Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: CTVS OT Repair Tenders | Bank Repair Tenders | Fire Station Construction Tenders |
| Tender Title | Establishment of New Fire Station at Mebo,East Siang District. (Re-Tender) |
|---|---|
| Tender Description | sub head:: site development: clearing and grubbing road land .(clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) by manual means: in area of light jungle sub-head:: building portion ground floorsub head: earthwork in excavation: earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by |
| Comments | sub head:: site development: clearing and grubbing road land .(clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) by manual means: in area of light jungle sub-head:: building portion ground floorsub head: earthwork in excavation: earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by |
| Published Date | |
|---|---|
| Due Date | 11 Mar 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |