The HPSEBL Tenders | Himachal Pradesh State Electricity Board Ltd has published a tender for "temporary diversion of water of Nogli khad into Power House water conductor system (Open Channel) w.e.f.01.04.2026 to 17.07.2026 (107days)." on the 26 Mar 2026. This tender belongs to Water Supply and Other Works category. This tender is published in Mandi, Himachal Pradesh location. The vendors interested in this tender and related Water Supply and Other Works tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: water supply works Tenders | residential building painting Tenders | floor sawing services Tenders
Related categories: Valve Chamber Tenders | Sluice Chamber Work Tenders | Sanitation Works Tenders |
In Mandi district, Himachal Pradesh, a total of 21 Water Supply and Other Works tenders have been published, with 3 tenders released last month.
| Tender Title | temporary diversion of water of Nogli khad into Power House water conductor system (Open Channel) w.e.f.01.04.2026 to 17.07.2026 (107days). |
|---|---|
| Tender Description | temporary diversion of water of nogli khad into power house water conductor system (open channel) by providing boulders/bushes/tree branches, sand filled gunny bags and maintaining water level in old intake structure by operating control structure gate to avoid water spillage by cleaning trash racks provided at various places in water conductor system such as at bell mouth gate, near desilting chamber. the desilting chamber valves should also be cleaned by operation respective valves including clearance of side drains complete in all respects as per the requirement and direction of eic given time to time. the attendant (s) should be equipped with mobile phone round the clock for the periodw.e.f.01.04.2026 to 17.07.2026 (107days).note :-1) the work will be suspended immediately if the services are not found satisfactory or hpseb ltd., provides its own man power for the purpose.2. empty gunny bags as per requriement of site will have to br arranged/provided by the contractor.at his own c |
| Comments | temporary diversion of water of nogli khad into power house water conductor system (open channel) by providing boulders/bushes/tree branches, sand filled gunny bags and maintaining water level in old intake structure by operating control structure gate to avoid water spillage by cleaning trash racks provided at various places in water conductor system such as at bell mouth gate, near desilting chamber. the desilting chamber valves should also be cleaned by operation respective valves including clearance of side drains complete in all respects as per the requirement and direction of eic given time to time. the attendant (s) should be equipped with mobile phone round the clock for the periodw.e.f.01.04.2026 to 17.07.2026 (107days).note :-1) the work will be suspended immediately if the services are not found satisfactory or hpseb ltd., provides its own man power for the purpose.2. empty gunny bags as per requriement of site will have to br arranged/provided by the contractor.at his own c |
| Published Date | |
|---|---|
| Due Date | 28 Mar 2026 00:00:00 |
| Estimated Value | 4.96 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |