The UDD Directorate Himachal Pradesh has published a tender for "Construction of Shop in ward No. 07 in bus stand NP DAULATPUR CHOWK." on the 14 Mar 2026. This tender belongs to Bus Stand Construction category. This tender is published in Mandi, Himachal Pradesh location. The vendors interested in this tender and related Bus Stand Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: Bank Building Construction Tenders | Bank Repair Tenders | Fire Station Construction Tenders |
UDD Directorate Himachal Pradesh issued 20 tenders for Bus Stand Construction last year
With, 0 floated just last month.
| Tender Title | Construction of Shop in ward No. 07 in bus stand NP DAULATPUR CHOWK. |
|---|---|
| Tender Description | earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge all kind of soils.. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:3:6(1 cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete footing centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete column centering and shuttering including strutting, propping etc. and removal of form for : lintels, beams, plinth beams, girders, bressumers and cantilevers beam size |
| Comments | earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge all kind of soils.. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level 1:3:6(1 cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete footing centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete column centering and shuttering including strutting, propping etc. and removal of form for : lintels, beams, plinth beams, girders, bressumers and cantilevers beam size |
| Published Date | |
|---|---|
| Due Date | 19 Mar 2026 00:00:00 |
| Estimated Value | 2.77 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |