Details: excavation in earth work and banking in 20cm. layers including breaking clods,ramming and dressing ground for the purpose of making embankment or filling up ground depressions upto all lead and lifts as per the entire satisfaction of the engineer - in charge. wire crate of g.i. wire filled with boulders with square cut faces against the wire(wire crate to be measured and paid separately) within all leads and lifts. wire crate made of g.i. wire filled with boulders with square cut faces against the wire (bolder filling to be measured and paid separately) 15 cm x 15 cm mesh g.i. wire 5mm thick corresponding to swg. 6 within all leads and lifts. stone / boulder filling behind the wire crate complete within all leads and lifts.
Sector: Medical and Health