Details: cost of feasibility study report (each heliport) conducting of site survey, topographical survey, obstacle limitation survey (ols) & soil testing etc. preparation of all desired manuals / documents for submission to dggca & bcas for obtaining necessary operational clearances for the heliport etc. note:- the rate excluding of goods service tax but including carriage of materials within all leads and lifts and other incidentals as per direction of engineer-in-charge, labour cess, other levies / taxes, duties , royalties, sale tax, octry, toll taxes of local bodies and authorities that the contractor will have to pay for the performance of this contract
Sector: PWD