| Tender Title |
CONSTRUCTION TO REHABILITATE OF OLD SEWER LINE IN THE WESTERN DISTRICT OF IMPHAL (SH CONSTRUCTION TO REHABILITATE OF OLD SEWER LINE IN THE WESTERN DISTRICT OF IMPHAL) |
| Tender Description |
design, supply, installation, curing, testing and commissioning of cipp (uv cured or approved equivalent) structural lining, sealing of any leakage and infiltration including carrying out corridor survey, pre-rehabilitation cctv survey, invert level survey, gis mapping, design, preparation and submission of drawings, method statements and approvals, complete, site preparation, access arrangements, temporary works, protection of existing utilities, dewatering and restoration for rehabilitation of 700 mm dia sewer, complete on turnkey basis, temporary plugging/blocking of sewer lines, bypass pumping and flow diversion arrangements including operation and removal after completion of works complete, de-silting, cleaning and disposal of silt, debris and foreign materials from existing sewer lines including transportation to approved dumping site, complete, reinstatement of service connections, sealing, grouting, traffic management and restoration for 700 mm dia sewer including road restorat |
| Comments |
design, supply, installation, curing, testing and commissioning of cipp (uv cured or approved equivalent) structural lining, sealing of any leakage and infiltration including carrying out corridor survey, pre-rehabilitation cctv survey, invert level survey, gis mapping, design, preparation and submission of drawings, method statements and approvals, complete, site preparation, access arrangements, temporary works, protection of existing utilities, dewatering and restoration for rehabilitation of 700 mm dia sewer, complete on turnkey basis, temporary plugging/blocking of sewer lines, bypass pumping and flow diversion arrangements including operation and removal after completion of works complete, de-silting, cleaning and disposal of silt, debris and foreign materials from existing sewer lines including transportation to approved dumping site, complete, reinstatement of service connections, sealing, grouting, traffic management and restoration for 700 mm dia sewer including road restorat |