Details: road works site clearing clearing grass and removal of upto a distance of 30m outside the periphery of the area as per the mort&h technical specification clause 201 dismantling of flexible pavements and disposal of dismantled materials with all lifts and upto a lead of 100 m, stacking serviceable materials and unserviceable materials separately as per mort&h technical specification clause 202 i. by mechanical meansa. bituminous course ii. manual meansb. granular layer loading and unloading of stone boulder, stone aggregate, brick aggregate, kankar, earth, crushed , stone for masorny work by mechanical means including a lead upto 30m haulage of materials by tipper/ truck excluding cost of loading, unloading and stacking. upgradation of roads construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in m 20 grade pcc on m-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb layi
Sector: Smart City