Description: Constraction of Drain Parking Area front side boundary wall bus service garage etc Name of Work Development of Integrated Parking Complex at Khowai Puran Bazar Constraction of Drain Parking Area front side boundery wall bus service garriage etc
Details: S.H:-1, Construction of drain. Excavation in Roadway cutting in soil by using manual means including loading in truck and carrying of cut earth to embankment site with all lifts and lead upto 1000 metre as per MoRT&H Technical Specification clauses of section 300.(SOR 2020 item no 3.1) Sand Filling in foundation trenches as per drawing & MoRT&H technical specification clause 304.(SOR 2020 item no 12.3) PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal sizemechanically mixed, placed in foundation and compacted by vibration including curing for 14 days as per drawings & MoRT&H technical specifications Clauses 2100. (including centering, shuttering, staging etc. but excluding reinforcement)(SOR 2020 item no 12.4) Brick masonry work in cement mortar in foundation completed excluding pointing & plastering as per drawing & MoRT&H technical specifications Clauses 1300.(SOR 2020 item no 12.5) Plastering with cement mortar (1
Sector: Urban Authority