Details: (a) s.h. earth work clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth lead up to 50 m and lift upto 1.5m disposed earth to be levelled and neatly dressed. - all kinds of soil. excavating holes upto 0.5 including getting out the excavated soil, then returning the soil as required in layersnot exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift upto 1.50 mtr. -all kinds of soil earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width
Sector: Buildings