Details: ii)flat brick soling. providing and laying flat brick soling layer on prepared subgrade according,filling joints with earth free from clay with a plasticity index not execeding 6,watering and rolling the same with three whecled road roller 80-100 kn as per mord technical specifical clause 412. water bound macadam sub-base / base using jhama brick aggragate2) wbm grading 3. providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing rolling with three wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading- 3 as per mord technical specification clause 405. (a) by manual means prime coat.(i) low porosity providing and applying prime coat with bitumen emulsion(ss-1)
Sector: Buildings