The Puducherry PORT Works Department has published a tender for "Dry-dock repair work" on the 17 Nov 2025. This tender belongs to Dry Dock Works category. This tender is published in Puducherry, Puducherry location. The vendors interested in this tender and related Dry Dock Works tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | dockyard construction and repair Tenders | harbour or shipyard work Tenders
Related categories: Stevedoring service Tenders | Dry Dock Works Tenders | Vessel Survey Tenders |
In Puducherry district, Puducherry, a total of 5 Dry Dock Works tenders have been published, with
| Tender Title | Dry-dock repair work |
|---|---|
| Tender Description | dry-dock repair works in dredger ‘karaikal’ -2025 removal of spuds and painting: removal of 2 spuds from the dredger and placing them on the floor for painting. the spuds should be placed over the wooden blocks to have a minimum clearance of 150mm.the wooden sleepers are to be brought by the contractor. the spuds should be reassembled on the dredger after completion of dry docking. i) dry-docking of dredger:positioning and placing the dredger over the cradle, hauling the cradle over the slipway by winch. lifting the dredger using jacks and placing over the wooden supports provided underneath the dredger at suitable locations as per the design & drawing of the dredger. before commencement of the work, it is to be confirmed that the dredger is stable on the supports. the slipway facility shall be provided by the department. ii) un-docking of dredger:after completion of works, the dredger to be un-docked safely from the slipway facility in to the water. underwater hull cleaning:r |
| Comments | dry-dock repair works in dredger ‘karaikal’ -2025 removal of spuds and painting: removal of 2 spuds from the dredger and placing them on the floor for painting. the spuds should be placed over the wooden blocks to have a minimum clearance of 150mm.the wooden sleepers are to be brought by the contractor. the spuds should be reassembled on the dredger after completion of dry docking. i) dry-docking of dredger:positioning and placing the dredger over the cradle, hauling the cradle over the slipway by winch. lifting the dredger using jacks and placing over the wooden supports provided underneath the dredger at suitable locations as per the design & drawing of the dredger. before commencement of the work, it is to be confirmed that the dredger is stable on the supports. the slipway facility shall be provided by the department. ii) un-docking of dredger:after completion of works, the dredger to be un-docked safely from the slipway facility in to the water. underwater hull cleaning:r |
| Published Date | |
|---|---|
| Due Date | 23 Nov 2025 00:00:00 |
| Estimated Value | 54.46 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |