The Haridwar Roorkee Development Authority Vice Chairman has published a tender for "Foot Ove Bridge" on the 09 Feb 2024. This tender belongs to Footbridge category. This tender is published in Hardwar, Uttarakhand location. The vendors interested in this tender and related Footbridge tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: bridges Tenders | all civil works Tenders | road and bridge Tenders
Related categories: Airport Runway Tenders | Road Paving Tenders | Road Relaying Tenders |
Around 2953 tenders were floated in Uttarakhand in the past month with major spending on water supply work Tenders, road construction Tenders, vehicle hiring Tenders
| Tender Title | Foot Ove Bridge |
|---|---|
| Tender Description | earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) centering and shuttering including strutting, propping etc. and removal ofform for : foundations, footings, bases of columns, etc. for mass concrete centering and shuttering including strutti |
| Comments | earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) centering and shuttering including strutting, propping etc. and removal ofform for : foundations, footings, bases of columns, etc. for mass concrete centering and shuttering including strutti |
| Published Date | |
|---|---|
| Due Date | 19 Feb 2024 00:00:00 |
| Estimated Value | 1.39 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |