Details: detailed topographical survey to delineate the cca of outlet, final plotting cadestral map (using dgps or any other advance survey instruments) and providing detailed ayacut planning up to chak boundary, transfer of planning in village map at contour interval of 0.25m/0.5 m, preparation of chaka wise ror details, preparation of fc/fd alignment for planning of ofd works, preparation of data on soil characteristics, climate data, cropping pattern, ground water profile, conducting pwt inclusive of camp rent and field mobility, preparation of final document of survey & planning (6 copies) including cost of all labour charges and materials, labour cess, cost of maps and all conveyances with gps coordinate at an interval of 15 m below outlet as per specification and direction of the engineer-in-charge.
Sector: Irrigation