Details: 300mm dia 5.0 m long single under reamed pile foundation with rcc m-30 using 20mm and down grade black hand granite crushed broken stone chips including cost of boring but excluding cost of m.s./tor steel and labour charges for cutting bending and binding of steel below ground level including cost,conveyance ,labour, labour cess, t&p and all other taxes etc required to complete the work in all respect as per direction of engineer in charge. supply, fabricate mild steel liner from 4 mm thick plates with shoe including cutting, bending, welding, transporting, alignment, placing in position,and driving to required depth. dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 in volume and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately shoring shuttering foundation trenches,pits etc with closed wooden plank
Sector: Harbor