Details: providing stone riprap to the slopes of earth dam and with quarried and stacked other than granite stone boulders of size 0.30m and above including dumping on slops filling intrestices with small stones & wedges and packing surface to proper line and levels including fixing wave breakers complete with all lead and lifts includingcost and conveyance of all materials,labour,t&p,cess including royalty, additional charges, emf, dmf etc. complete & as per approved design as directed by the engineer-in-charge. (no deduction towards voids in finished section) removing hard granite blasted stone from d/s riprap packing and repacking with the old stones including loading, unloading, conveyance, and other taxes with all leads, lifts and delifts for dumping stone in d/s riprap packing, cost of labour, t&p and supervision charges etc. complete as per approved design as directed by the engineer-in-charge.
Sector: Irrigation