Details: earth work in excavation in foundation in hard or gravelly soil within 50 mtr. initial lead and 1.5 mtr. initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and t&p for the work etc. complete and as directed by the engineer-in-charge. supplying, filling in foundation and plinth with sand in 22.5 cm (9") thick layers including watering and ramming with cost, conveyance, royalties, labour and labour cess with t&p required for the work etc complete as per the direction of the engineer-in-charge. providing and laying plain cement concrete of grade m-15 in foundation as levelling course using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using high strength approved quality cement and coarse granite aggregate conforming to table 1000-1 with formwork as per section 900,1000,1500,1700, 2100 of specifications for road
Sector: PWD