Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per clause 201 of mort&h specifications for road & bridge works (5th revision) & including cost of all labour, t&p, royalty etc complete and as per direction of engineer-in-charge. providing and laying compacted wbm with 40mm size hard granite hand broken metal and filling the interstices with stone screening quarry dust, conveying from stacks spreading metal to proper camber and consolidation with p.r.r. including hire and running charges of prr and including cost of all materials, labour, labourcess, t&p, royalties, watering etc. complete as per direction of the engineer-in-charge. providing and applying p
Sector: PWD