Details: clearing the existing blacktopped surface with removal of foreign materials with brooms or soft brushes & finally dusting with old gunny bags & or compressed air to recive bitumen etc complete providing tack coat on prepared bituminous surface with bitumen emulsion (rs) and spreading @ 0.20kg per sqm using mechanical means as per technical specifications and as per clause -501 & 503 of mort&h specifications for road & bridge works (5th revision) including cost, conveyance & other taxes of materials, cost of labour, machinery, t&p etc complete. providing 50mm compacted thick bituminous macadam of grading -2 using crushed stone gr.-2 materials & 60/70 grade of bitumen preparing preemixed materials with bituminous binder with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per clauses 501 and 504 of mort&h specifications for road & bridge works (5th
Sector: PWD