Details: providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (as per dsr 4.1.10) providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). kiln seasoned and chemically treated hollock wood. (as per dsr 9.1.3) structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (as per dsr 10.2) kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match
Sector: General Admin