Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. 1. all kinds of soil brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:cement mortar 1:6 (1 cement : 6 coarse sand). providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level1:3:6 (1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 thermo-mechanically treated
Sector: Cooperative Federation