Description: Protection of Neamatighat from erosion of River Brahmaputra Phase I Name of Work Protection of Neamatighat from erosion of River Brahmaputra Phase I
Details: Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10mx0.10mx3.00m with M-30 grade of cement concrete conforming to IS 1343 : 2012 using super-plasticizer @1.2 lit/bag of cement with graded broken coarse aggregates up to 20mm size down conforming to IS 10262:2009 & IS 456:2000 and reinforced with 4 nos. of 4mm dia high tensile steel wire cable with necessary cover and 4mm high tensile stirrups at 250mm C/C, in conformity with IS-6403:R2002 and stressed to required strength not exceeding 9.18 N/mm, holes of 16mm dia at 50cm inside from both ends in the same face and in either face of post another 2 Nos. of holes properly curing for 21 (twenty one) days and carriage of porcupine members from factory to the stack yard within a distance up to 20 Km including loading, unloading & stacking complete as directed. (Including forest royaltry and all taxes as admissible) Labour charge for launching of PSC Porcupine including carriage of PSC porcupine members of size 0.10m x
Sector: Water Resource Department