Details: ga 11.03 ( assam) section-a : works for cgs receiving and taking over of all owner supplied materials from owner's designated place(s) of issue, transportation including loading, unloading, handling from owner's designated place(s) of issue to contractor's own stock yard(s) / work site(s) / work shop(s) including arranging all necessary intermediate storage area(s) thereof, as required; supply of all materials (except those specified subsequently in sor), equipment, consumables as defined in contractor's scope of supply and their transportation to the work site(s); performing all above ground/buried piping fabrication works including cutting, edge preparation (inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven / different thickness wherever required), fit up, bending, pre-heating wherever required, welding, threading etc.; of pipes of all types and thickness over sleepers, overhead on racks and at all elevations; hook-up with
Sector: Industry Development