The Tribal Cooperative Marketing Development Federation of India Limited has published a tender for "Corrigendum 2 - Pre Bid Meeting (TRIFOOD Jagdalpur)" on the 06 May 2020. This tender belongs to Landslide protection work category. This tender is published in Bastar, Chhattisgarh location. The vendors interested in this tender and related Landslide protection work tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | concrete works Tenders | earth filling Tenders
Related categories: Erosion Control Services Tenders | Breakwater Construction Tenders | Landslide protection work Tenders |
Chhattisgarh has published 0 tenders in Landslide protection work in the last financial year.
Out of these, 0 were published last month.
Tender Title | Corrigendum 2 - Pre Bid Meeting (TRIFOOD Jagdalpur) |
---|---|
Tender Description | dismantling of old damaged floor including its disposal i/c cost of all material,labour and t&p etc. completeearthwork in excavation in all type of soil/silt i/c cost of all lead,lift,labour and t&p etc. completeproviding and laying boulder apron for bed protection with stone boulders of minimum size and weight as per table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specification clause 1301supplying and laying r.b.m i/c cost of all material,labour and t&p etc. completem-100 brick work in 1:4 c.m in floor i/c cost of all material,labour and t&p etc. completelaying c.c m-10 (1:3:6) i/c cost of all material,labour and t&p etc. completeproviding and laying of boulder qpron laid in wire crates with 4 mm dia gi wire (@ 32 kg/ 10 sqm) conforming to is:280 and is:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and tech |
Comments | dismantling of old damaged floor including its disposal i/c cost of all material,labour and t&p etc. completeearthwork in excavation in all type of soil/silt i/c cost of all lead,lift,labour and t&p etc. completeproviding and laying boulder apron for bed protection with stone boulders of minimum size and weight as per table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specification clause 1301supplying and laying r.b.m i/c cost of all material,labour and t&p etc. completem-100 brick work in 1:4 c.m in floor i/c cost of all material,labour and t&p etc. completelaying c.c m-10 (1:3:6) i/c cost of all material,labour and t&p etc. completeproviding and laying of boulder qpron laid in wire crates with 4 mm dia gi wire (@ 32 kg/ 10 sqm) conforming to is:280 and is:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 percent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and tech |
Published Date | |
---|---|
Due Date | 15 May 2020 00:00:00 |
Estimated Value | 0.0 |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |