Details: earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ordinary soil. mechanical means depth upto 3m. rcdsor 12.01 b (i) plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications. pcc grade m15 using batching plant & manual placing. rcdsor 12.08b case i plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications. rcc grade m20 using batching plant & manual placing. rcdsor 12.08c case ii plain/reinforced cement concrete in sub-strucutre complete as per drawing and technical specifications. pcc grade m20 using batching plant, transit mixer & concrete pump height upto 5.0m. rcdsor 13.05b(p) plain/reinforced cement concrete in sub-strucutre complete as per drawing and technical speci
Sector: Road development