Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. by mechanical means using dozer in area of light junglevide r.c.d. s.o.r. 2.3 (ii) a cutting of trees, including cutting of trunks, branches and removal (cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)girth from 300 mm to 600 mmvide r.c.d. s.o.r. 2.01(a + b)(i) cuttin
Sector: Road development