Description: Construction of Pump Shed at Stage 1st near Offtake for WSS Poshwan Gadikhal under JJM Name of Work Construction of pump shed at Stage 1st near offtake for WSS POshwan Gadikhal under JJM Advertised Cost Rs 6 04 lacs Contractors are advised to quote their rates in excess or less or equal to the advertised cost in the shape of percentage Option is given at the end of the BOQ
Details: Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : Providing and laying of dry stone soling tightly hand packed on horizontal levels. Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 5.1.1 DELETED 5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 5.1.3 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Reinforced ceme
Sector: Water supply and Sewerage