The Jammu Kashmir Irrigation Flood Control Department has published a tender for "Modification alteration and shifting of pumping unit including suction delivery MS pipeline to new base structure and allied mechanical works at LIS Galandar" on the 09 Mar 2023. This tender belongs to Pump House Construction category. This tender is published in Pulwama, Jammu and Kashmir location. The vendors interested in this tender and related Pump House Construction tenders can obtain further details by registering in the Tendersniper web portal. Upon registration, Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | pumping station Tenders | blasting services Tenders
Related categories: Airport Runway Repair Tenders | Road Paving Tenders | Road Relaying Tenders |
Around 6905 tenders were floated in Jammu and Kashmir in the past month with major spending on road construction Tenders, drain construction Tenders, public toilet construction Tenders
Tender Title | Modification alteration and shifting of pumping unit including suction delivery MS pipeline to new base structure and allied mechanical works at LIS Galandar |
---|---|
Tender Description | Dismantling of the 05 cusec pumping unit after disconnecting all the cables from prime- move uncoupling motor from pump, dismantling suction delivery joints near pump. dismounting pump and prime-mover from the base frame. The job involves shifting the pumping unit to the new installation spot (new base civil structures along with respective Base frame after cutting removing of the damaged base using suitable means Dismantling extracting by way of gas cutting of the existing MS 200 mm dia suction and delivery pipe line suction line 762 M and delivery line 15 M including existing priming ircuit and foot valve, and shilling the same to new site of installation by using necessary man power including tools and tackles Installation of the available, MS Base frame on the newly constructed structure with proper alignment The available drought unit shall be rested on base frame. The job includes providing and fitting of new 08 No Base bolts of required size for safe fixing of the pumping uni |
Comments | Dismantling of the 05 cusec pumping unit after disconnecting all the cables from prime- move uncoupling motor from pump, dismantling suction delivery joints near pump. dismounting pump and prime-mover from the base frame. The job involves shifting the pumping unit to the new installation spot (new base civil structures along with respective Base frame after cutting removing of the damaged base using suitable means Dismantling extracting by way of gas cutting of the existing MS 200 mm dia suction and delivery pipe line suction line 762 M and delivery line 15 M including existing priming ircuit and foot valve, and shilling the same to new site of installation by using necessary man power including tools and tackles Installation of the available, MS Base frame on the newly constructed structure with proper alignment The available drought unit shall be rested on base frame. The job includes providing and fitting of new 08 No Base bolts of required size for safe fixing of the pumping uni |
Published Date | |
---|---|
Due Date | 05 Apr 2023 16:00:00 |
Tender Open Date |
Estimated Value | 0.0 |
---|---|
EMD | 1306 INR |
Processing Fee | 100 INR |