Design, Construction, Planning, Supply, Installation, Testing and Commissioning of Sewage Treatment Plant (STP) of 130 KLD Capacity based on MBBR-Technology on EPC Mode including operation and maintenance for Two Years at Transit Accommodation P_I |
| Tender Description |
1. civil work:- construction of bar screen chamber, oil and grease chamber, equilisation tank, anoxic tank, sludge holding tank, tube setting tank, filter feed tank, filter feed pump, activated carbon filter, pump, poly dosing system, water storage tank including operator pannel room, sokage pit and stp pipe network including other ancillary civil works as per approved vetted drawings.2. electro-mechanical equipments:-design, supply, construction, installation, testing, and commissioning of all electro-mechanical equipment required for the stp, including but not limited to pumps, blowers, mixers, diffusers,psf, acf, disinfection, dosing system, sludge handling systems, valves, actuators, instrumentation, automation, control panels, servo, system piping, lifting equipment and associated accessories, complete in all respects on epc mode. all equipment shall be suitably rated for the specified capacity and operating conditions, provided with necessary protections, and integrated with |
| Comments |
1. civil work:- construction of bar screen chamber, oil and grease chamber, equilisation tank, anoxic tank, sludge holding tank, tube setting tank, filter feed tank, filter feed pump, activated carbon filter, pump, poly dosing system, water storage tank including operator pannel room, sokage pit and stp pipe network including other ancillary civil works as per approved vetted drawings.2. electro-mechanical equipments:-design, supply, construction, installation, testing, and commissioning of all electro-mechanical equipment required for the stp, including but not limited to pumps, blowers, mixers, diffusers,psf, acf, disinfection, dosing system, sludge handling systems, valves, actuators, instrumentation, automation, control panels, servo, system piping, lifting equipment and associated accessories, complete in all respects on epc mode. all equipment shall be suitably rated for the specified capacity and operating conditions, provided with necessary protections, and integrated with |