The Jammu Kashmir Irrigation Flood Control Department has published a tender for "MID/AN/07" on the 19 May 2026. This tender belongs to Power Line Maintenance category. This tender is published in Jammu, Jammu and Kashmir location. The vendors interested in this tender and related Power Line Maintenance tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: electrical power line maintenance Tenders | electric meter boxes Tenders | all power line work Tenders
Related categories: Lighting installation services Tenders | High Mast Light Tenders | Street Light Installation Tenders |
In Jammu district, Jammu and Kashmir, a total of 175 Power Line Maintenance tenders have been published, with 10 tenders released last month.
| Tender Title | MID/AN/07 |
|---|---|
| Tender Description | disconnecting 11kv incoming power supply to 500kva capacity, 3-phase, 11kv/440v onan cooling vector group dy-11. lt transformer by disconnecting all the electrical connections and loading the transformer in the mechanical vehicle with the help of mobile crane and all the tools and tackles required to execute the job and then shifting to workshop for its repairs and unloading at workshop. the job includes draining out of transformer oil into barrels (420 liters. approx). disassembling the transformer at workshop by disassembling of all the fasteners i.e. nuts, bolts etc. extracting of transfer coils assemblies out of the main housing, complete disassembling of transformer assembly-core and damaged coils and allied parts at workshop. providing/fixing of new hv coils as per sample size of requisite specifications with proper f-class insulation (2-legs@66 kg per leg/limb) in place of all damaged coils of the limb/leg. reconditioning of lt coils (3-leg@56 kg per leg/limb) of transformer. th |
| Comments | disconnecting 11kv incoming power supply to 500kva capacity, 3-phase, 11kv/440v onan cooling vector group dy-11. lt transformer by disconnecting all the electrical connections and loading the transformer in the mechanical vehicle with the help of mobile crane and all the tools and tackles required to execute the job and then shifting to workshop for its repairs and unloading at workshop. the job includes draining out of transformer oil into barrels (420 liters. approx). disassembling the transformer at workshop by disassembling of all the fasteners i.e. nuts, bolts etc. extracting of transfer coils assemblies out of the main housing, complete disassembling of transformer assembly-core and damaged coils and allied parts at workshop. providing/fixing of new hv coils as per sample size of requisite specifications with proper f-class insulation (2-legs@66 kg per leg/limb) in place of all damaged coils of the limb/leg. reconditioning of lt coils (3-leg@56 kg per leg/limb) of transformer. th |
| Published Date | |
|---|---|
| Due Date | 28 May 2026 00:00:00 |
| Estimated Value | 2.34 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |