The Jammu Kashmir Irrigation Flood Control Department has published a tender for "Stage contract Phase ist for the restoration and maintenance of different canal/khuls khareef in respect of ISD Sopore MH-2702 M and R for the year 2026-27" on the 31 Mar 2026. This tender belongs to Canal Strengthening category. This tender is published in Baramula, Jammu and Kashmir location. The vendors interested in this tender and related Canal Strengthening tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: canal Tenders | all civil works Tenders | blasting services Tenders
Related categories: Canal Lining Tenders | Canal Gates Fabrication Tenders | Canal Desilting Tenders |
Jammu and Kashmir has published 1,996 tenders in Canal Strengthening in the last financial year.
Out of these, 56 were published last month.
| Tender Title | Stage contract Phase ist for the restoration and maintenance of different canal/khuls khareef in respect of ISD Sopore MH-2702 M and R for the year 2026-27 |
|---|---|
| Tender Description | earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil. earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil. excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every |
| Comments | earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil. earth work in bulk excavation by mechanical eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil. excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every |
| Published Date | |
|---|---|
| Due Date | 06 Apr 2026 00:00:00 |
| Estimated Value | 4.0 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |