The JKPWD has published a tender for "Improvement / Up-gradation of road from Sialag to Bagg (Under NABARD) Phase-1st. RIDF-XXXI." on the 31 Mar 2026. This tender belongs to Road Construction category. This tender is published in Kathua, Jammu and Kashmir location. The vendors interested in this tender and related Road Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: road Tenders | road and drain Tenders | all civil works Tenders
Related categories: Road Construction Tenders | Bus Bay Tenders | Road related beautification Tenders |
Jammu and Kashmir has published 12,534 tenders in Road Construction in the last financial year.
Out of these, 253 were published last month.
| Tender Title | Improvement / Up-gradation of road from Sialag to Bagg (Under NABARD) Phase-1st. RIDF-XXXI. |
|---|---|
| Tender Description | earthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth lead upto 50m and lift upto 1.50 mtr. as directed by engineer-in-charge. all kind of soil. = 80% ordinary rock. = 20% filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. earthwork in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out the excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 mtr. a) all kind |
| Comments | earthwork in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth lead upto 50m and lift upto 1.50 mtr. as directed by engineer-in-charge. all kind of soil. = 80% ordinary rock. = 20% filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. earthwork in excavation by mechanical means (hydraulic excavator) in trenches for foundation, drains, pipes etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out the excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 mtr. a) all kind |
| Published Date | |
|---|---|
| Due Date | 06 Apr 2026 00:00:00 |
| Estimated Value | 4.28 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |