The JKPWD has published a tender for "Balance work Construction of road from Balnoi to Lower Balnoi via KS Kishti, Tehsil Mankote District Poonch by way of Balance Earth work Providing and Laying WBM Gr-II WBM Gr-III Hume Pipes Retaing wall and Wall in Km 10th-13th Length 2.50 Km." on the 22 Dec 2025. This tender belongs to Road Related Works category. This tender is published in Punch, Jammu and Kashmir location. The vendors interested in this tender and related Road Related Works tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: all civil works Tenders | road and drain Tenders | road and bridge Tenders
Related categories: Drain and bridge Tenders | Road and building Tenders | Road Related Works Tenders |
Jammu and Kashmir has published 2,407 tenders in Road Related Works in the last financial year.
Out of these, 31 were published last month.
| Tender Title | Balance work Construction of road from Balnoi to Lower Balnoi via KS Kishti, Tehsil Mankote District Poonch by way of Balance Earth work Providing and Laying WBM Gr-II WBM Gr-III Hume Pipes Retaing wall and Wall in Km 10th-13th Length 2.50 Km. |
|---|---|
| Tender Description | earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byengineer-in-charge.all kinds of soil : 50%ordinary rock : 30%hard rock : 20% disposal of excavated earth. supplying and stacking at site63 mm to 45 mm supplying and stacking at site13.2 mm nominal size (type a). supplying and stacking at sitegood earth. supplying and stacking at site53 mm to 22.4 mm supplying and stacking at site11.2 mm nominal size (type b) supplying and stacking at sitestone dust.) laying, spreading and compacting stone aggregate of specified sizes 63-45 mm to wbm ii specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate |
| Comments | earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byengineer-in-charge.all kinds of soil : 50%ordinary rock : 30%hard rock : 20% disposal of excavated earth. supplying and stacking at site63 mm to 45 mm supplying and stacking at site13.2 mm nominal size (type a). supplying and stacking at sitegood earth. supplying and stacking at site53 mm to 22.4 mm supplying and stacking at site11.2 mm nominal size (type b) supplying and stacking at sitestone dust.) laying, spreading and compacting stone aggregate of specified sizes 63-45 mm to wbm ii specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate |
| Published Date | |
|---|---|
| Due Date | 26 Dec 2025 00:00:00 |
| Estimated Value | 1.12 Crore |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |