Details: engagement of labourers for clearance of site etc demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge:1:4:8 or leaner mix (i/c equivalent design mix) dismantling damged tile work in floors and roofs including stacking material within 50 meters lead. demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) form work centering / shuttering including strutting, propping etc and removal of form work for:(a) foudation, footings, basis, coloumsetc providing and laying in position cement concrete of specified gr
Sector: Urban Authority