Details: name of work: general overhauling of hot water generators and allied items at trauma hospital kangan. item description2opening of the thermax make amw 04 hot water boiler, thoroughly cleaning inside and outside both in case of coil and the shell, removing of soot and carbon deposits. the inside of coil shall be cleaned by circulating through it a solution of max clean decaling compound of thermax make (approx. 25 kg) and water of required strength continuously for 24 hours with the help of a pump the solution is to be circulated from a tank/ barrel / tray. brushed, detergents, diesel/ kerosene oil dhoti cloth required shall be arranged and provided by the contractor. all other accessories of the boiler including burner gun, nozzles, electrodes, diffuser plate etc., have to be dismantled and reassembled after servicing/ repairs. the job includes replacement of all seals/ gas kits, asbestos rope asbestos belt asbestos sheet, defected nuts and bolts etc. the tools, tackles require
Sector: PWD