The Haryana Government has published a tender for "Construction of Non residential building phase III and IV in Sainik School at Gothra Tappa" on the 09 Nov 2023. This tender belongs to Hostel Construction category. This tender is published in Rewari, Haryana location. The vendors interested in this tender and related Hostel Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: residential building Tenders | all civil works Tenders | residential building construction Tenders
Related categories: Apartment Construction Tenders | Generic Residential Construction Tenders | Cooperative Construction Tenders |
Haryana has published 188 tenders in Hostel Construction in the last financial year.
Out of these, 4 were published last month.
| Tender Title | Construction of Non residential building phase III and IV in Sainik School at Gothra Tappa |
|---|---|
| Tender Description | [20.71.1]supply, , testing of ceiling fans is marked (as per is code 374) with suitable gi pipe complete in all respects complete as per directions of engineer-in-charge 1. 48" (1200mm) [23.11]making suitable hole in the wall suitable for exhaust fan up to 450 mm sweep including finishing the same and fixing of stainless steel wire mesh 2 mm thick having about 50 meshes per inch at exhaust side complete as required [23.12]providing and fixing outdoor duty ply of 12 mm thick frame suitable for exhaust fan up to 450 mm sweep etc complete as required [23.20]fixing of led tube light/ 2*2 ft square panel fitting directly on wall /ceiling or false ceiling including making connections etc as required [23.22.1.9]mccb ,distribution boards, mcb`s, rccb`s, change over etc. 1.9. supply and of modular case circuit breaker single pole/4 pole on existing wall/pedestal/panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire s |
| Comments | [20.71.1]supply, , testing of ceiling fans is marked (as per is code 374) with suitable gi pipe complete in all respects complete as per directions of engineer-in-charge 1. 48" (1200mm) [23.11]making suitable hole in the wall suitable for exhaust fan up to 450 mm sweep including finishing the same and fixing of stainless steel wire mesh 2 mm thick having about 50 meshes per inch at exhaust side complete as required [23.12]providing and fixing outdoor duty ply of 12 mm thick frame suitable for exhaust fan up to 450 mm sweep etc complete as required [23.20]fixing of led tube light/ 2*2 ft square panel fitting directly on wall /ceiling or false ceiling including making connections etc as required [23.22.1.9]mccb ,distribution boards, mcb`s, rccb`s, change over etc. 1.9. supply and of modular case circuit breaker single pole/4 pole on existing wall/pedestal/panel including bounding to earth and making necessary connections required to complete the job in all respect up to the entire s |
| Published Date | |
|---|---|
| Due Date | 21 Nov 2023 00:00:00 |
| Estimated Value | 7.09 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |