The Haryana Government has published a tender for "P/ Fixing iron jal from H/o Bharat to H/o Rajan and H/o Arun in Ward No 4 in MC Dharuhera." on the 12 Feb 2026. This tender belongs to Structural Iron Work category. This tender is published in Rewari, Haryana location. The vendors interested in this tender and related Structural Iron Work tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: structural steel work Tenders | all civil works Tenders | iron fabrication Tenders
Related categories: Placing of Reinforce Concrete Tenders | Elevator Front Installation Tenders | Exterior Metal Wall System Installation Tenders |
Around 8344 tenders were floated in Haryana in the past month with major spending on unit paving Tenders, community hall construction Tenders, food grain transport Tenders
| Tender Title | P/ Fixing iron jal from H/o Bharat to H/o Rajan and H/o Arun in Ward No 4 in MC Dharuhera. |
|---|---|
| Tender Description | [13.29.2]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [through rate] [3.1.6]by mechanical transport including loading, unloading and stacking 6. stone aggregate 40 mm nominal size and above [5km] [5.23.2]demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. 2. nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [through rate] [6.1.1]providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level: 1. 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size) [through rate] |
| Comments | [13.29.2]steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [through rate] [3.1.6]by mechanical transport including loading, unloading and stacking 6. stone aggregate 40 mm nominal size and above [5km] [5.23.2]demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. 2. nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [through rate] [6.1.1]providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work below plinth level and up to floor iv level: 1. 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size) [through rate] |
| Published Date | |
|---|---|
| Due Date | 12 Feb 2026 00:00:00 |
| Estimated Value | 1.55 Lakh |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |