Details: [3.1.2]by mechanical transport including loading, unloading and stacking 2. earth [beyond 10km up to 20km per km] [4.33]excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [through rate]
Sector: General Admin