Details: hsr item 17.5.3-compacting original ground 3. compaction of earthworkcompaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the table 3000-2 as per technical clause 305 of mort&h specificationshsr rate(rs.) 7.00 through rate hsr item 21.93.1-providing and fixing sfrc manhole covers and frames marked with is: 12592 includingsetting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the engineer-in-charge. 1.type:- extra heavy duty set (ehd-35) 560mm clear openinghsr rate(rs.) 1155.00 through rate hsr item 13.28-structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hois
Sector: General Admin