Details: job work on labour rate:contract for the preparation of milk of lime for crushing season 2024-25. contractor shall arrange sufficient man power in each shift to do the following jobs:- contract for the preparation of milk of lime for crushing season 2024-25. contractor shall arrange sufficient man power in each shift to do the following jobs:-1. contractor shall keep sufficient stock of lime at lime station platform from stored lime place.2. prepare milk of lime through lime slaker and lime classifier.3. remove the grit to desire place.4. keep proper cleaning around milk of lime pumps, pit enclosure, catcher, lime slaker platform, lime classifier, milk of lime gutter and grit conveyor.5. keep always one tank fill with milk of lime of 7-8° be and another half tank fill with milk of lime as running tank.6. contractor shall store the balance quick/unslaked lime at desire place after closure of crushing season.7. contractor shall make the bundles of empty lime bags and store at desired
Sector: Urban Authority