Details: taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of engineer-in-charge. earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge: separation membrane of impermeable plastic sheeting 125 micron thick steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. thermo-mechanically treated bars o
Sector: Management Education