The Department of Chemicals and Petrochemicals has published a tender for "Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit; As per ATC; As per ATC" on the 23 Mar 2026. This tender belongs to Gas filling service category. This tender is published in Begusarai, Bihar location. The vendors interested in this tender and related Gas filling service tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: industrial gases Tenders | acetylene gas Tenders | ammonia gas Tenders
Related categories: Antenna Installation Tenders | Antenna Repair Tenders | Artificial Turf Installation Tenders |
CPDS issued 0 tenders for Gas filling service last year
With, 0 floated just last month.
| Tender Title | Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit; As per ATC; As per ATC |
|---|---|
| Tender Description | coa shall be submitted along with each supply for each type of cylinder.2. the composition of these cylinders’ stability should be min.12 months, filling capacity: as perstandard pressure, water capacity (l): 10l3. refilled cylinders of hurl shall be supplied within 45 days after intimation received from officer incharge of hurl.4. cleaning, degreasing & actioning of hurl cylinder if required.5. supplied cylinder after refilling of calibration gases should be without any leakage. if any leakageobserved from the valve during receipt, cylinder will not be accepted.6. empty calibration cylinders carried from hurl site with cylinders caps need to be dispatched withcaps fitted properly after filling.7. cylinder shall be with bull nose fitting and with female thread.8. in case cylinder valve leaks, the supplier needs to carry out all the required activities to address theissue prior to refilling and dispatch.9. carrying empty cylinder and sending filled cylinders to hurl site is under bidder |
| Comments | coa shall be submitted along with each supply for each type of cylinder.2. the composition of these cylinders’ stability should be min.12 months, filling capacity: as perstandard pressure, water capacity (l): 10l3. refilled cylinders of hurl shall be supplied within 45 days after intimation received from officer incharge of hurl.4. cleaning, degreasing & actioning of hurl cylinder if required.5. supplied cylinder after refilling of calibration gases should be without any leakage. if any leakageobserved from the valve during receipt, cylinder will not be accepted.6. empty calibration cylinders carried from hurl site with cylinders caps need to be dispatched withcaps fitted properly after filling.7. cylinder shall be with bull nose fitting and with female thread.8. in case cylinder valve leaks, the supplier needs to carry out all the required activities to address theissue prior to refilling and dispatch.9. carrying empty cylinder and sending filled cylinders to hurl site is under bidder |
| Published Date | |
|---|---|
| Due Date | 13 Apr 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |