Description: Attending oil leakage from PRV of 200 MVA T F II BHEL Make at 220 KV S S C B Ganj under E T D Bareilly Name of Work work for REPLACEMENT OF 36KV VCB TO ATTEND THE EMERGENCY BREAKDOWN AT VARIOUS SUBSTATIONS REPLACEMENT OF DPP PANNEL AT 132KV SUB STATION BAREILLY TOWN DURING THE PERIOD OF ONE YEAR UNDER ETD BAREILLY
Details: Replacement of defective/damaged 33KV VCB Installed at 220KV S/S C.B. Ganj, 132KV S/S Baeilly Town, 132KV Bareilly-II (Balipur), 132KV S/S MEERGANJ, 132KV S/S Faridpur &132KV S/S Richha. Dismantling of 33KV Damaged/Defective VCB after removal of both side jumper and earthing , including shifting of dismantled VCB from switch yard to storage place/store room. Modification of 33KV VCB foundation as per site requirement/as per manufacturing drawing or as per direction of supervising Engineer . Erection of new 33KV VCB in proper alignment and cable Termination of circuit breaker as per logic for tripping /closing / spring charging / indication / supervision ckt with proper ferruling and checking out of breaker operation from Local / remote, including earthing and connection of both side jumpers and works related to complete the erection work. All required T&P, skilled labours, crane/Hydra etc. shall be arranged by the contractor at his own cost. Loading of various equipments like CT,PT,
Sector: Transmission