Details: bijnor bid project cost bid project cost (including all taxes) for 100 mld stp bid project cost (including all taxes) for associated infrastructure bijnor o&m charges o&m charges for 100 mld stp for first month after cod manpower maintenance and repair consumables guaranteed energy consumption for 100 mld stp for the first month after cod (value should be entered in all cell from 2.06 to 2.11. the permissible value of maximum to minimum gec quoted in cell 2.06 to 2.11 should be less than or equal to1.4 ) for flow ≤ 60 mld and bod ≤ 175 mg/l for flow ≤ 60 mld and bod > 175 mg/l and ≤250 mg/l for flow ≤ 60 mld and bod >250 mg/l for flow > 60 mld and bod ≤ 175 mg/l for flow > 60 mld and bod > 175 mg/l and ≤250 mg/l for flow > 60 mld and bod >250 mg/l stp average gec power charges for 100 mld stp (=100 mld x units consumed/mld x 5475 x 7.65 x 1.5) (not to be filled by the bidder) o&m charges for bijnor associated infrastructure for first month after cod manpower maintenanc
Sector: Water supply and Sewerage