| Tender Title |
Establishment of Advanced Semiconductor Processing Cleanroom Facility on Turnkey Basis including Design, Engineering, Supply, Installation, Integration and Commissioning in Dept. of Electronics Engineering, IIT(BHU), Varanasi. |
| Tender Description |
Design, Supply, Installation, Testing & Commissioning of ISO Class 6 Modular Cleanroom Facility with HVAC,Flooring Electrical,Firealaram,Process Gas ,CCTV & Access control Automation, Validation & Associated Turnkey WorksLAB -A 101,LAB -A 102,LAB -A 103. All bidder-manufactured items and supplied outdoor systems shall carry a minimum manufacturing warranty of two (2) years. Design, Detailed Engineering, Supply, Installation, Testing, Commissioning, Balancing, Validation, and Handing Over of ISO Class 6 Cleanroom Facility for Gowning Entry Room No. A101 (Approx. 65 Sq.ft.), RIE Lab-1 Room No. A102 (Approx. 278 Sq.ft.), and RIE Lab-2 Room No. A103 (Approx. 134 Sq.ft.) on complete turnkey basis, including all cleanroom architectural systems, modular wall and ceiling panels, cleanroom doors, flooring, HVAC and air conditioning systems with AHU, ducting, HEPA filtration, airflow management, temperature and humidity control systems, cleanroom equipment, electrical works from high side to l |
| Comments |
Design, Supply, Installation, Testing & Commissioning of ISO Class 6 Modular Cleanroom Facility with HVAC,Flooring Electrical,Firealaram,Process Gas ,CCTV & Access control Automation, Validation & Associated Turnkey WorksLAB -A 101,LAB -A 102,LAB -A 103. All bidder-manufactured items and supplied outdoor systems shall carry a minimum manufacturing warranty of two (2) years. Design, Detailed Engineering, Supply, Installation, Testing, Commissioning, Balancing, Validation, and Handing Over of ISO Class 6 Cleanroom Facility for Gowning Entry Room No. A101 (Approx. 65 Sq.ft.), RIE Lab-1 Room No. A102 (Approx. 278 Sq.ft.), and RIE Lab-2 Room No. A103 (Approx. 134 Sq.ft.) on complete turnkey basis, including all cleanroom architectural systems, modular wall and ceiling panels, cleanroom doors, flooring, HVAC and air conditioning systems with AHU, ducting, HEPA filtration, airflow management, temperature and humidity control systems, cleanroom equipment, electrical works from high side to l |